You will learn

  • The prerequisites needed to set up a Fail-back
  • How to perform a fail-back in HANA Studio
Elena Grigorova E Elena Grigorova November 1, 2022
Created on September 22, 2017
Contributors

Prerequisites

Prerequisites

  • Proficiency: Advanced
  • Tutorials Performing a Takeover
  • Credentials: Have access to the SYSTEM user of SystemDB and “<SID>adm” for a SSH session on the HANA hosts.

Steps

Time to Complete

15 Min


Step 1 Introduction

To fail-back to your original primary system, you must switch the roles of your systems back to their original configuration. To do so, the original primary system will have to be started as a secondary system. After both systems are back in sync, you can perform a takeover on the original primary system.

Before you perform a fail-back, ensure that the following pre-requisites are met:

  • You are logged on to both systems as the operating system user (user <sid>adm) or are able to enter these credentials when prompted.
  • You have performed a data backup or storage snapshot on the current primary system. In multiple-container systems, the system database and all tenant databases must be backed up.
  • The original primary system is not running.
  • The current primary system is running.
Step 2 Performing a Failback
+

Resources

Discussion